Wuxi Pro-face Electronics Co., LTD. (Schneider Electric) Intelligent Storage project

2018.05.21Intelligent storage



Before improvement:The material circulation data cannot be obtained automatically and all works are performed manually; work order material preparation costs a lot of manpower and time with low efficiency; the material accumulates and tailing material loss is serious.

Improved:Intelligent bins automatically execute to replace personnel for material matching and searching; material warehousing information flow docks with MES system; automatic inventory of tailing materials is fast and accurate.







Intelligent Technology Co., Ltd. Intelligent Storage Equipment

2017.08.23Intelligent storage



Before improvement:Relying on manual loading and unloading causes waste of manpower; the workshop is chaotic with a low automation degree.

Improved:Intelligent bins automatically execute to replace personnel for material matching and searching; save manpower and the loading and unloading costs of the warehouse.











BYD Motors Co., LTD. Intelligent Material Bin Project

2017.08.23Intelligent storage



Before improvement:Material ReelID label printing costs a lot of manpower; work order material preparation costs a lot of manpower and time with a low efficiency; tailings inventory costs a lot of manpower and materials

Improved:Visual code screening and labeling machine automatically completes the ReelID labeling work; replacement of manual dosage, material finding and feeding by intelligent material bin and AGV; the tailing material is automatically counted by X-Ray SMT Counter.





Suzhou Xinzhi Industry Co., Ltd. Intelligent Storage Project

2017.07.19Intelligent storage



Before improvement: Work order material preparation costs a lot of manpower and time with low efficiency; the material accumulates at the production line and it takes time and manpower to find materials when receiving materials;low distribution efficiency

Improved:Intelligent bin automatically executes to replace manual material matching and searching; SLAM navigates AGV to realize automatic loading and unloading of PCB panel; high distribution efficiency.















Jiangsu Simand Electronic Co., Ltd. Intelligent Storage Project

2017.05.10Intelligent storage



Before improvement:Work order material preparation costs a lot of manpower and time with low efficiency; the material accumulates at the production line and it takes time and manpower to find materials when receiving materials; there are a variety of materials with chaotic management and it is easy to load wrong materials.

Improved:Intelligent bins automatically execute to replace personnel for material matching and searching; the station information is automatically printed to the material tray when the material is delivered; JIT mode based on MES and Panosonic system.